Steuben Wind Project

The proposed Steuben Wind Project is located in the Towns of Hartsville and Hornellsville, in Steuben County, New York. The proposed Project will consist of up to 36 wind turbines, with a total generating capacity of up to 79.5 MW. The Project is anticipated to include 31 turbines in the Town of Hartsville, and up to 5 turbines in the Town of Hornellsville. As currently conceived, the Project will use the General Electric (GE) MTS sle Turbine (or equivalent), which will include a three-bladed rotor, with a diameter of 77-meters (253-foot), mounted on an 80-meter (263-foot) tubular steel tower, for an overall tip height of 389 feet. In addition to the installation of wind turbines, the Project would include the installation of related components and support facilities to deliver power, and operate and maintain the Project including up to approximately 10 linear miles of gravel access roads, up to 25 linear miles of buried 34.5 kV electrical collection (except where physical, environmental and/or economic constraints render it necessary to use overhead lines); a substation adjacent to an existing New York State Electric and Gas (NYSEG) 115 kilovolt (kV) transmission line; one meteorological tower; a ten-acre construction staging area(s); and an approximately 4,000 square foot single story operations and maintenance (O&M) facility with associated parking.

Robert Crowell
Senior Vice President, Development
T +1 312 923 9463
steubenwind@eon.com

E.ON Climate & Renewables
401 N. Michigan Av., Ste. 1720
Chicago, IL 60611

Steuben Wind Project Draft Environmental Impact Statement (DEIS)
The DEIS has been accepted as complete by the Steuben County Industrial Development Agency‘s Board of Directors (Lead Agency). A public hearing will be held at the Arkport Central School Performing Arts Center, 35 East Avenue, Arkport, New York 14807, on March 25, 2009 at 6:00 p.m. The Lead Agency will accept public comments on the DEIS until April 6, 2009.

Paper copies of the Steuben Wind Project DEIS files are available for viewing at the following locations:

Hartsville Town Clerk
5150 Purdy Creek Road
Hornell, New York 14843

Hornellsville Town Clerk
4 Park Avenue
Arkport, New York 14807

Hornell Public Library
64 Genesee Street
Hornell, New York 14843

Arkport Book Center
2 East Avenue
Arkport, New York 14807

Steuben County Industrial
Development Agency (SCIDA)
7234 Route 54 North
Bath, New York 14810-0393



Below please find links to the Steuben Wind Project DEIS that was prepared in accordance with the State Environmental Quality Review Act (SEQRA) and accepted by SCIDA on February 26, 2009:
Deis
(Accepted as complete February 26, 2009)
Deis Figures
Deis Appendicies